Turn- Key Detergent Powder Project


On June 5, 2021, 

after the joint efforts of the two sides to overcome the severe difficulties of the epidemic

 and ensure the smooth progress of installation and commissioning, the Zambian detergent powder plant with a capacity of 15 tons per hour built 

by Asia Chemical Engineering Co., LTD was successfully put into production that day.

 

      